Containment Failure Detected
MELTDOWN
Emergency Access Protocol

Identify yourself to continue

Containment Control

MELTDOWN

Puzzle Prototype Suite · Select a puzzle to test

Room 1 — Containment Control
Room 1 · Puzzle 1
Coolant Valve Sequencer
Open coolant valves in the correct pressure order before reactor temperature reaches critical threshold.
SEQUENCING
P-01
Room 1 · Puzzle 2
Circuit Breaker Grid
Restore power by toggling circuit breakers. Each switch affects its neighbours — find the combination that restores the grid.
LOGIC
P-02
Room 1 · Puzzle 3
Emergency Broadcast Tuner
Decode a corrupted transmission log to find the correct emergency frequency. Tune all three dials to restore communication.
DECODING
P-03
Room 1 · Puzzle 4
Compound Synthesiser
Match unstable chemical compounds to their neutralising agents using atomic weight data before containment fails.
MATCHING
P-04
Room 1 · Puzzle 5
Coolant Pipe Router
Rotate pipe segments to create a continuous coolant path from the source to the reactor core before the pump overheats.
SPATIAL
P-05
Room 1 · Puzzle 6
Biometric Lock
Memorise the access panel sequence and replicate it exactly. Each failed attempt scrambles the pattern.
MEMORY
P-06
Room 1 · Puzzle 7
Encrypted Comms
An intercepted transmission is encoded. Use the cipher key from the room briefing to decode the override message.
DECODING
P-07
Room 1 · Puzzle 8
Anomaly Scanner
The reactor schematic has been corrupted. Identify all system faults before the diagnostic window closes.
OBSERVATION
P-08
Room 1 · Puzzle 9
Emergency Protocol
Emergency procedures have been scrambled. Restore the correct sequence before the automated system executes them in the wrong order.
SEQUENCING
P-09
Room 2 — Reactor Core
Room 2 · Puzzle 1
Control Rod Override
Memorise the target control rod configuration and set each rod to the correct position before the reactor destabilises.
MEMORY
P-10
Room 2 · Puzzle 2
Core Temp Stabiliser
Reactor quadrants are running at critically different temperatures. Balance the heat distribution before thermal cascade begins.
BALANCE
P-11
Room 2 · Puzzle 3
Meltdown Countdown Override
Solve the reactor equations under pressure. Each correct answer reveals a digit of the emergency override code.
MATHS
P-12
Room 2 · Puzzle 4
Containment Breach Map
Sensor anomalies indicate containment breaches. Use pressure readings to locate and seal all breach points before coolant loss.
LOGIC
P-13
Room 2 · Puzzle 5
Isotope Sorter
Radioactive isotopes have been mixed in the containment bay. Sort them by stability and half-life before the shielding degrades.
SORTING
P-14
Room 2 · Puzzle 6
Pressure Seal Matrix
Seal the pressure grid by activating the correct combination of pressure nodes. Row and column indicators show how many seals are needed.
LOGIC
P-15
Room 2 · Puzzle 7
Final Evacuation Route
Plot the safest evacuation path through the facility. Avoid structural collapse zones and reach the emergency exit before time runs out.
SPATIAL
P-16